Product Description
PROJECTRONICS
what u’ll get in packet –
Bulb holder with connector attached, Complete circuit , Stepdown transformers, street lights, project report about 60pages
Delivery within India – Appx. Within 05 Days
Abstarct –
The project is an automatic load operation system that controls load operation, multiple numbers of times according to programmed instruction. The project eliminates the manual ON/OFF switching of load. A real time current sensing device is used to measure the current and automatically switch ON/OFF the load sequentially. This project is required for load shedding time management which is used when the electricity demand exceeds the supply and there comes a need for manually switching ON/OFF the electrical devices in time. Hence this system eliminates the manual operation by automatically switching the load ON/OFF. This is a best project on electrical engineering students. To attain our concept, need to use Atmega328p controller, Solid state Relays, current sensor, buzzer, LCD, step-down transformers and towers. The fault occurring is displayed on a 16X2 LCD interfaced with the microcontroller.
Apparatus required
1. Atmega328p – 1
2. Current transformer – 1
3. Step-down transformer – 4
4. RYB cable – 1meter each
5. Bulb holders – 1
6. Bulb – 1
7. Buzzer – 1
8. 100 uf capacitor – 6
9. 10k resistor- 13
10. 10k preset – 3
11. Bc547 – 4
12. Crystal 16mhz – 1
13. 22pf – 2
14. Relay 12v/7amp – 3
15. Diode in 4007 – 25
16. LCD 16/2 – 1
17. Led – 50
18. 12v adaptor – 1
Product Details:
| Usage/Application | Engineering project/school project |
| Power | 5v |
| Brand | projectronics |
| Size | 2feet/1.5 feet |
| Country of Origin | Made in India |
Additional Information:
- Item Code: P-0889
- Production Capacity: 10
- Delivery Time: Appx 5days
- Packaging Details: Complete circuit with complete report











